Aug 17 - 21 Maintenance and Repairs
Friday, August 21, 2015
Carla was in Nashville spoiling grandkids. Dwayne worked on the boat. The genoa sail went to the sail loft. Meade A. Breese, sailmaker of Rock Hall did
the work. He re-stitched the sacrificial
cloth, patched and re-stitched the clew seam, added some webbing to reinforce the
clew ring, and installed a new leech cleat.
Randy came out to trouble-shoot the air conditioning/heating
system. Diagnosis: the compressor is overheating and needs to be
replaced. Terrie from Kato Marine called, the
steering wheel was re-welded. Dwayne cut
out the plastic starboard pieces and bought the materials necessary to install
the dinghy’s sonar/depth sounder and the anchor wash-down pump. He also washed the bird droppings off the
deck.
No comments :
Post a Comment
Leave A Comment...